Search LoginOnline Contact Form

Latest News

Apple Festival


Energy Depot

You are here: Zoning > Zoning Fees & Application

ZONING FEES - Effective 08/06/04 - Revised 07/04/07

YOU MAY DOWNLOAD OUR ZONING APPLICATION AND VARIANCE APPLICATION IN EITHER WORD DOCUMENT OR ADOBE .PDF FORMAT:

ZONING APPLICATION WORD FORMAT ADOBE .PDF FORMAT 
VARIANCE APPLICATION WORD FORMAT  ADOBE .PDF FORMAT  

OUR ZONING MAP CAN BE DOWNLOADED IN .PDF FORMAT.

RESIDENTIAL SUBDIVISIONSingle Family Dwelling and/or two-Family Dwelling:

Preapplication/Conceptual Plan Review $200.00
Preliminary Plan Review $200.00 
Final Plat and Detailed Construction Plan Review (Each Phase) $400.00 


MULTI-FAMILY RESIDENTIAL DEVELOPMENT:

Pre Preapplication/Conceptual Plan Review $200.00 
Preliminary Plan Review       $300.00 
Final Plan Review (Each Phase) $400.00 

Inspection/Testing shall be Time and Expense as Determined by the Village Administrator

NEW CONSTRUCTION OF COMMERCIAL, BUSINESS/PROFESSIONIAL, INDUSTRIAL AND INSTITUTIONAL

Preapplication/Conceptual Plan Review$200.00
 
Preliminary Plan/Final Plan Review     $700.00 

Inspection/Testing shall be Time and Expense as Determined by the Village Administrator

REMODELING, ADDITIONS AND ALTERATIONS TO COMMERCIAL, BUSINESS/PROFESSIONAL, INDUSTRIAL AND INSTITUTIONAL:

Preapplication/Conceptual Plan Review $200.00 
Preliminary Plan/Final Plan Review $700.00 

Inspection/Testing shall be Time and Expense as Determined by the Village Administrator

BUILDINGS & STRUCTURES:

New Single Family Home$400.00 
New Two-Family Home $425.00
New Multi Family Home $400.00 + $10.00 per unit > 2 
Attached Garage $30.00 
House and Garage Additions $30.00 
Accessory Bldgs., Garages and Sheds $30.00 
Decks and Porches $15.00 
Signs $20.00 
Pool  $20.00 
Fence  $15.00 
 Bistro/Cafe Tables $25.00 annually
Commercial (New)  $350.00 minimum or $.04/sq.ft. 
Commercial (Addition) $  50.00 minimum or $.04/sq.ft.
Industrial (New) $350.00 minimum or $.04/sq. ft. 
Industrial (Addition)$  50.00  minimum or $.04/sq. ft.

OTHER:

Application for Zoning Change $350.00 
Appeal $175.00 
Variance $175.00 
Conditional Use $175.00 
Copy of Zoning Regulations $25.00 
Flood Hazard Developemnt Permit $25.00
Lot Split Review     $30.00 Minimum - $10.00/Lot Created 
 Driveway Approach$25.00
 Driveway Deposit$ 7.25 Sq. Ft. - Refundable
 
The initial zoning permit application fee includes the fee for the certificate of completion.

In all reviews completed for the Zoning Board of Appeals or Planning Commission the applicant shall be charged for actual costs incurred if those cost exceed the fees as set forth herein.

All fees shall be paid at the time of application for review and/or permit.